Kakinada Deep Water Port Coal Terminal - KDWPCT
Bothra Shipping Services has established the KDWPCT at berth no. 5 of Kakinada Deep Water Port under license from Kakinada Seaports Ltd. The terminal is on Design Build Operate Maintain and Transfer (DBOMT) basis and was established in 2012.
KDWPCT is a fully mechanised bulk unloading Terminal with a capacity of 8MMTPA and accepts vessels from Supramax upto Cape Size with a draft of 14.5m. The terminal also has an arrangement for coal blending during discharge.
Terminal Capacity : 8 MMTPA
Cargo : Coal (all types), Bauxite, Gypsum, Limestone
Central Operation Control system
Remote monitoring – CCTV system
Kakinada Deep Water Port Coal Terminal - KDWPCT
Bothra Shipping Services has established the KDWPCT at berth no. 5 of Kakinada Deep Water Port under
license from Kakinada Seaports Ltd. The terminal is on Design Build Operate Maintain and Transfer
(DBOMT) basis and was established in 2012.
KDWPCT is a fully mechanised bulk unloading Terminal with a capacity of 8MMTPA and accepts vessels
from Supramax upto Cape Size with a draft of 14.5m. The terminal also has an arrangement for coal
blending during discharge.
Terminal Capacity | : | 8 MMTPA |
---|---|---|
Cargo | : | Coal (all types), Bauxite, Gypsum, Limestone |
Central Operation Control system | ||
Remote monitoring – CCTV system |
Cargo handled by KDWPCT in past few years has been as follows :
2021-2022
1029208 mt
2020-2021
1323190 mt
2019-2020
2963530 mt
Terminal specifications
- Marine Infrastructure
- Cargo handling infrastructure
- Stockyard
- Cargo Evacuation Infrastructure
- Connectivity
- Key Users
Marine Infrastructure
Berth Length | 300 m |
---|---|
Draft | 14.5 m |
Vessel Size | Supramax, Panamax, Kamsarmax, Mini capes, Cape size |
Cargo handling infrastructure
Harbour Mobile Cranes | 3 x LHM550 |
---|---|
Mobile Hoppers | 3 Nos. |
Conveyor System | 3413m (2,400TPH) |
Average Handling capacity | 25,000TPH |
Online Coal Blending during discharge |
Stockyard
Capacity | 113,600 m2 |
---|---|
Stacker Reclaimer | 2 x 2,400 / 1,800 TPH |
Dust suppression system | |
Coal Crushing Plant |
Cargo Evacuation Infrastructure
Rail siding | 2 Nos. x 750m |
---|---|
Rake loading time | 3hrs per rake |
Truck loading stations with independent hoppers | |
Rail Travelling Loader | x1,800TPH |
In-Motion Weigh Bridge |
Connectivity
Road | NH 216 Passing through Kakinada NH 6(old #5) Connected by 60 KM ADB Road |
---|---|
Rail | Kakinada is connected by a 20 KM Railway line to Howrah – Chennai Trunk line |
Key Users
Uttam Galva Steels, Trafigura, Ramco Cements, Adani, Tata International, JSW, UTCL |
Contact
President - Business Development
ravi@bothragroup.com
kkd@bothragroup.com
+91 884 236 063
Address
Operations Office:16-23-67/1/A, Plot no 32,
Road No-3, Pallam Raju Nagar,
Kakinada - 533007
Andhra Pradesh, India