Timely and Efficient
Future - New Vistas and new Responsibilities
Bothra Group is a future driven group with a tradition of innovation, adoption of new technology, and new business processes. This philosophy has prompted Bothra Group to invest in the future in energy transportation sector, beginning with an investment of 100 Million USD at Kakinada.

Coal Terminal, Kakinada, India
By an arrangement with the Port Authorities, Kakinada Seaports Ltd, Bothra Group is in the process of establishing a 8 Million MT per annum Coal Terminal – Kakinada Deep Water Port Coal Terminal (KDWPCT) at Kakinada Deep Water Port on the Design, Build, Commission and Operate (DBCO) basis.

The terminal will be operational in first quarter of 2013.It would be capable of unloading from vessel up to about 40,000 MT/day.Direct Loading Facility from the Vessel to Rake for utmost quick despatch. Rail evacuation and despatch by loading a full rake in about 3 hours, and over 1 Million MT of stockyard capacity. The KDWPCT will have a mechanized Coal Blending System; probably the first such system to be available in East Coast of India Ports. Coal Blending would be carried out by variable speed reclamation from stockyard and blending during movement through transfer towers and at stacker. Blended Cargo storage yard of 200,000 MT will help separate stowage of Blended Cargo and can be reclaimed mechanically and dispatched by rail or road.

Read more
Click to download
KDWP Coal Terminal Brochure


KDWP Fertilizer Terminal Brochure